Client - Azrieli Group
Location - Rishon LeZion, Israel
Year - 2021
Status - In work (Permit stage)
Supervisors:
- Slavik Chokler (Mann-Shinar Architects)
- Amir Mann (Mann-Shinar Architects)
Responsibilities:
- design options and planning for Zappa Concert Hall on the mall rooftop
- design options for lobby interior design
- design options for upper atriums
- visualization (renders, 3D modeling)
- technical drawings (permit plans, sections, aluminium drawings)
- automation script-writing (aluminium facade triangulation for Azrieli tower and Zappa Concert Hall)
Existing building (finished in 2017).
The project includes two additional stages:
- tower extension (+9 floors)
- Zappa Concert Hall on the rooftop of the mall
original design process for stage 1
lobby design options for stage 2
visualization for stage 2 (completed office tower extension)